Call us Today
0845 2570235

Triangular Bridging System Between Mobile Towers

Bridge Units combine easily with traditional Scaffolding and Towers

P1010396.JPGThis arrangement combines two mobile scaffold towers and the Triangular Bridge System. By using special triangular frame adapters, it is possible to hang the Bridge between every type of mobile scaffolding provided that the diameter of the scaffolding pipe is 50mm or smaller. The maximum span between two towers is 17 metres and the maximum working height with two towers is 22 metres (note: at this height the towers must be firmly attached to the wall).

 

This system is very useful with projects requiring a big span, for example renovations and building work. It is also extremely well suited for work in areas with difficult access e.g. above a swimming pool or machinery, and over a large conservatory or extension.

 

Over conservatory.JPG

See Photo Gallery for more or Call us on 01494 582051 for prices.